From: route@monster.com
Sent: Thursday, April 07, 2016 12:01 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: p6 Scheduler
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Browning
S. Wharton Home Base: 2625 Keene Park
Dr., Largo, FL 33771 Email: Selden1@yahoo.com Ph#: 727-547-1817 (C) I
am an integrated Materials Requirements Planner and Master Scheduler for
Domestic and International Manufacturing Delivery Support System
Resources. I have utilize various Enterprise Resource Planners
(BPCS/ERP) throughout both commercial industry and Military DoD Manufacturing
Execution Systems (MES) supported by ISO9001 Quality Management System
Requirements. I began MRP manually and eventually migrated to MRP II
plus Rough Cut Capacity Forecasting Scorecard Analysis that level load Work
Centers and later progressed to automated tracking management systems to
Line-of-Balance Shop Floor Inventory, Work in Process and support for On-Time
Product Shipping Schedules. …Thereby automating and incorporating
open database connectivity Forecasts and Poly-Metric Lean Six Sigma
“Industrial Engineering Methods” for both elimination of waster factors and
for Net Aggregate Requirements Calculations (NARC) as well as for Detailed
Aggregate Requirements Calculations that directly target independent &
dependent Materials Demand and support Production Planning & Controls
toward on-time product delivery within a multi budgeted production delivery
manufacturing operation. Data object record sets are tailored via
back-end ERP (BPCS/AS400 and MAPICS SYS34) EBOM-to-MBOM Events for both Make
and Buy; the goal is “No-Out-of-Sequence-Actions” required. ACHIEVEMENTS: M.S. Computer Information Systems, University of Phoenix
- 2004 B.S. Industrial Technology, Southern Illinois University - 1988 A.A. Accounting, San Bernardino Valley Community College
– 1985 CPIM Review
Certified through Newport News Shipbuilding – 2001 Primavera
Certified (P6) Integrated Master Scheduling – 2008 U.S. Air Force - Honorable Discharge - 1983 EXPERIENCE: 1999
– Present: Independent Contractor for Program Management Projects Planning
& Controls with base-lined EVMS ·
Captured Product Definition for BELL Helicopter’s “525
Relentless” Composite Rotorcraft Civil Transport. Master Scheduled
& Integrated Systems Development Design (SDD) Change Management EBOM
Impact Items, Make-Buy, Configuration Revisions, Drop-In and Drop-Out Events
within the IMP & IMS, and Integrated the MFG First Article Build Plan
(FABP), initiated story boarding process via IPT and cross-functional work groups,
defined WBS Scope and Timekeeping buckets to capture Criteria Detail Task
Sequence for Milestone Achievements, Forecasted & Tracked 30-60-90 Day
Look-Ahead Gantt Views and status’d impacts to the CPM delivery Networks
(PERT Diagrams). ·
Tracked Engineering Changes through the Product Data
Manager (PDM) ENG Release Decision Gate Configuration Control Board (CCB) IPD
Scheduled Events. Identified constraints and status’d established Team
meetings for Water-Line, Concept, and Technical & Operational Peer
Reviews. Created Integrated Standard Work Tool schedules and automated
estimated scheduled work release (ESWR) for off-board Model Base design by
reporting to and supporting the Chief Project Engineer. ·
Instigated, coordinated, coached and Integrated –
vertically & horizontally – multiple Program Management Office Cost
Account Manager’s (CAM) Plan of Action & Milestones (POAM),
drive-to-ground adjudicated and approved Program Management (PM) Commitment
Development Schedules for multiple CAM baseline Integrated Master Schedule
(IMP/IMS). Isolated and reduced Level of Efforts (LOE) thereby
identifying CDLR and Timekeeping specific Earned Value Program
deliverables. Provided Basis of Estimate (BOE) time-phased Man Mountain
requirements, Budget vs. Actual (BUVA) and Outstanding events driven
poly-metrics. ·
Created Use Case Studies, migrating GE’s Legacy Data from
On-Line Planning (OLP) “PEAR” database systems to GE’s new Siemens Team
Center, documenting knowledge in engineering configuration planning
scheduling concepts and how they relate to cost-schedule integration
performance in GE’s Earned Value Management system. Maintained
questions, issues, resolutions database, involving domestic and global
teleconferencing levels of effort across the GE Aviation business sector for
data migration for 14 Next-Gen Power plants Fan Case Assemblies. ·
Creation of both Integrated Master Schedules and Master
Schedule Template for the high level Acquisition Strategy for Coast Guard’s
Off Shore Patrol Cutter (OPC) Acquisition Strategy. Developing WBS,
SWBS and related indenture path Milestone Events, Accomplishments and
supporting Criteria. ·
Planning MES router instructions, Catia V5 and IVT design
studies, CrossPoint implementation, update team center and WT systems.
Create tracking metrics; publish ship side support manuals for base line and
MOD plans. Worked with Composites via PDM Team Center and MES in conjunction
to First Article builds and visual factory; utilizing Catia V5 to screen
shots and operational sequence planning. ·
Developed WBS structure to assure trace ability of
integrated schedules, conducted performance analysis to develop and
coordinate integrated resource plans and forecasts for internal and external
customer and complete IBR, define critical path network, float and resolve
integrated schedule constraints, plan and provided EV metrics and forecasts
for internal program management. ·
Mediated risk assessment, recovery planning, predictive
analysis, what if & Lead Time/duration analysis to accurately understand program
status. Identified corrective action/mitigation to ensure budgeted
costs & scheduled targets are achieved. Worked with Multi layer
Composites, Autoclaves, exotic metals, fabrication tooling, hydro-jets, CMM
geometric tolerance (Model Based Definitions). ·
Global Sourcing Initiative (GSI):
Scheduling complete WBS (Indenture Path Generation Breakdown) for 747-400
& 747-8: EBOM to MBOM compare for gap analysis, TLG, Source Codes,
Additions & Deletions for Kits, Advises management of the status of work
in progress, material provision, and production impact events to ensure
personnel, equipment, materials, and services are provided via lean JIT
methods. · Primarily
responsible for reporting all-up sales orders delivery schedules, work center
schedules and variance reports for planning and Shop Floor Control
management. Provide scheduling for engineering changes with the intent of
meeting customer and program requirements. Generated MPS, Detail
Schedules, exception reports and established work center capacity
levels. Automated production schedules using SQL, VBA & algorithms. ·
Provide the technical leadership, resolution on all
programs for assigned personnel to meet schedules, quality and measurements,
and organizational goals; manage generic process programs and lead area in
pursuit of state of the art processes that will enhance organizations
producibility, manage organization's cost superiority and investment program;
compile and bid on materials and estimation of cost basis within the
estimation group and interface with design engineering, projects, assembly
and vendors. · Developed
and resolved technical solutions to production problems. Defined and
developed sequence of operations that affect product performance and tooling
concepts. Lead activities within define/produce/supplier teams. Identified
and implements advanced manufacturing technologies. Produced
manufacturing plans and design changes to plans. Defined and translated
engineering requirements for Assembly, Installation & Test. ·
Under general supervision, designed and planned layouts,
realigned Material Control floor space and collocated quality inspection
resources to assist in lean process standardization. Initiated Material
Rejection Reports, Engineering Change Orders and provided leadership in the
procurement of short and long lead-time materials. 1987
- 1999: Boeing, Sr.
Manufacturing Engineer Projects Engineer: Systems, Structures &
Payloads & Mechanical Tooling ·
Direct employee to Boeing to
complete cut-over from legacy systems to windows based schedule editor for
the precedence control of man hours, crew-cycle and assembly flow of
operations from a ten day line-rate to an eight day line-rate. Prepared
Daily IPT meeting agenda reviewing Lean Manufacturing Methods and chaired the
status of all forecasted delays and on-time deliveries of 747 Wing Panels,
submitted Budget verses Actual reports to General Managers for review and
disposition for 767, 747 and 777 (WRC). Developed ERP/PDM
strategic implementation planning of FAI/FAR configuration, MRP and
materials management systems. Executed intent of project engineer
change types, performed producibility impact studies related to factory
processes, materials, tooling, parts, assemblies & installations.
Processed scheduled events to material/vendor support requests, integrated
off-board engineering with planning improvements for future shop work package
incorporation. Reviewed automated systems to support customers,
avoiding long lead item fab part shortages and negative schedule impact.
Coordinated Tool Fab details. Project Engineer (06EX) - SAIC,
Shanghai China: Planning Change Notices for factory impact items
related to part-to-tool relationships. Page
1 of 2 |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|